The importance of the different stages in construction – Act 14, Act 15 and Act 16
One of the most important steps in the home buying process is researching the real estate market, which in turn requires a good knowledge of the nature of the so-called Act 14, Act 15 and Act 16. We would like to share with you the most basic information about them, in order not to find yourself unprepared and also to be aware of what they guarantee you.
Generally speaking, these terms categorize the various stages of real estate construction. Each one is related to a separate phase and meets certain regulatory requirements established by Spatial Development Act (SDA). Their main idea is to control the construction and installation activities before the owners of the building can move into it. Below we will examine the meaning of each of them.
Act 14
The first step of the construction process corresponds to the term Act 14. It includes the preparation of the project documentation and obtaining the necessary permits. In this stage, the technical drawings, the project budget, the technical specification and other necessary materials are prepared. The entire said roll is used to obtain the permit documents from the relevant control authorities that certify and allow the right to start construction. In reality, the builder receives it when the building is in the “rough-in” stage. The next stage of the process is the actual construction of the property.
Deed form 14 is signed by the client (investor), the construction supervisor and the designer. Once the document is finalized, the property can be transferred through a notary to the buyer, who will also receive the title in the form of a notarial deed.
In short, if you decide to buy a property that is at the Act 14 stage, it means that the construction company has received the planning permission and has started construction of the building. However, the building has not yet been completed and has not received an official permit for use, called Act 16.
Act 15
The next stage in the construction of the building is the so-called Act 15, which is an indicator of the finalization of the construction. He includes the implementation of construction works and installations. We could give an example with the establishment of the foundation, the construction of the walls, the installation of the electronic and plumbing installations, the installation of the suspended ceilings and other necessary activities.
Act 15 is prepared by the investor, the builder and all related technical persons on the project, by the construction supervision, as well as by the operating companies. Actually, Act 15 is a proof that the construction meets all the requirements for construction, as well as the initial investment assignments. Practically, this document is a report of findings, which means that thanks to it the building can enter into operation. It contains all performance contracts, acts and protocols related to construction. At the same time, it reflects the measurements and additional activities carried out so far related to the correct execution of the construction. Also, there is a description of all the finishing works, which, however, are not completely finished at this stage.
If you decide to buy a property that is at the Act 15 stage, it means that the building has been completed. This is a positive stage for the property buyer because he does not have to wait for additional time for the construction of the building to be completed. Also, this stage can make the mortgage loan approval process easier, as financial institutions prefer to lend money on properties that are already completed and licensed.
Act 15 creates a prerequisite for drawing up the most important final protocol for permission to use the property.
Act 16
This is the third and final stage in the process, which includes the completion of construction works and the handover of the site to the client. This long-awaited document by the home owners declares the suitability of the building for exploitation. In the colloquial language, its name ” Certificate of Habitation ” is most often used, but in reality, many are not aware that there is a certain difference concerning the different categories of construction. When it comes to the construction of infrastructure such as roads, highways, intersections, etc., they are categorized in the 1st to 3rd groups and a “Permission to Use” is issued for them by the Regional Directorate for National Construction Control. Whereas, constructions of the type of dwellings, blocks of flats, houses, villas, are placed between the 4th and 6th category and for them, not Act 16, but the so-called Commissioning Certificate/Building Use Permit, is issued by the Chief Architect of the municipality.
As a home buyer, in the given property, you can rest assured that with this permit, all criteria and performance conditions are coordinated and complied with in relation to the pre-approved construction. Also, you could perfectly legally reside in your new home and register it as y